Update from the PBAC (December 2025)

PBAC

12 December 2025 - The PBAC update following the November 2025 PBAC meeting is now available.

A final total of 38 submissions were on the November 2025 meeting agenda, of which 28 required external evaluation. The submissions requiring external evaluations included 20 cost effectiveness/cost utility analyses, and 8 cost minimisation analyses.

Read PBS News

Michael Wonder

Posted by:

Michael Wonder